Call for Abstracts - Technical Forum, 2 November 2017

02 November 2017

Latest News

View all
  • Register for 30 August 2018 Technical Forum - Sand Control Fluids Delivering Well Performance

    Our morning session will be an interactive discussion on the interpretat...

    30/07/2018View article


  • New dates for Technical Forums

    The final two Technical Forums for Phase 8 will be held on 6 June in Sta...

    09/04/2018View article


  • Call for Abstracts - Technical Forum, 2 November 2017

    At our last Technical Forum we focussed specifically on Downhole systems...

    02/11/2017View article


Upcoming Events



At our last Technical Forum we focussed specifically on Downhole systems designed to deliver effective sand control in ever more challenging environments and how these systems have evolved over the past two decades.

For the next Technical Forum the theme will be Topside Monitoring and Sand Production Management and we would like to hear and discuss subject matter such as topside design considerations, well operating limitations, equipment installation limitations, data management and interpretation and or case histories that details strategies to deliver effective long term life of well sand management while maintaining optimum production.   

 

Specific areas of interest include:

 

-        Holistic strategy implementation for sand management

-        Sand production monitoring and KPIs for successful sand control

-        Methodologies, lessons learnt and best practices for evaluating sand management strategy

-        Topside sand control techniques and monitoring

-        Topside sand handling techniques - safe and environmentally sustainable ​sand disposal

-        New technologies for top sides sand management and sand handling

-        Well optimization techniques – data acquisition and monitoring

 

Contact Katrina Dunbar, Network Manager on 01224 900035 or katrina.dunbar@dunbar-eandm.co.uk for more details. 

Website design, Development and Hosting by mtc.